ASBESTOS AIR MONITORING · FOUR-STAGE CLEARANCE · ESSEX
Asbestos air monitoring measures how many respirable fibres are in the air in a given place at a given time. Air is drawn through a filter at a controlled rate, the filter is examined under a microscope and the result is reported as fibres per cubic centimetre against the standard that applies: the workplace control limit of 0.1 f/cm³ over four hours, or the clearance standard of less than 0.01 f/cm³ before a building is reoccupied. Testing follows HSE guidance HSG248. Based in Great Wakering near Southend-on-Sea, we cover Essex, London and the wider South East.
Sampling rates, durations, filter handling and reporting all follow HSE guidance HSG248, so the figures mean what the standard says.
Clearance after licensed work is carried out by an analyst independent of whoever did the removal. That independence is the point.
Every result is reported against the standard it was measured to, with the method and the duration stated, never as a bare number.
Where all four stages pass, the certificate of reoccupation is issued, and that is what allows the area to be handed back for use.
What It Is
A pump draws a measured volume of air through a filter for a set period. The filter is cleared and examined under a phase contrast microscope, the fibres counted, and the count converted to fibres per cubic centimetre. That figure describes the air in that place, over that period, under those conditions. It is a snapshot, and reading it as anything else is the most common mistake made with air results.
What it does not tell you is whether a material contains asbestos — that is bulk analysis — or whether the fibres counted are asbestos rather than another mineral or organic fibre, because phase contrast microscopy counts fibres by shape, not by type. Where that distinction matters a different analysis is needed, and we will say so rather than over-reading a standard count. A clear air result on a building that has never been surveyed proves very little.
Test Types
HSG248 defines four, and they answer different questions.
Taken before work starts to establish what is already in the air, so anything measured later has a known starting point.
Taken after work, or after a disturbance, to show the air in an area is back to normal levels before people use it again.
Taken outside an enclosure while licensed work is in progress, to show the enclosure is holding and nothing is escaping.
The air stage of four-stage clearance after licensed removal, measured against less than 0.01 f/cm³ before reoccupation.
Clearance
Four-stage clearance is the formal check that an area is fit to be reoccupied after licensed removal, and the air test is only one of its four stages. Stage one is a review of the job: the paperwork, the plan of works, and whether what was done matches what was notified. Stage two is a thorough visual inspection inside the enclosure — the stage that fails most often, because dust and debris in a corner is a visual failure whatever the air says.
Stage three is the air test itself, measured against less than 0.01 fibres per cubic centimetre. Stage four is the final assessment after the enclosure comes down, confirming the area is left safe. Only when all four pass is the certificate of reoccupation issued. The analyst is independent of the removal contractor, and the certificate is what a client, an insurer or an enforcing authority will ask to see afterwards.
When It Applies
Four-stage clearance before anyone goes back in. The air stage is measured against less than 0.01 fibres per cubic centimetre, and nothing is handed back until it passes.
Reassurance testing once the area has been made safe, to show the air is back to normal levels before anyone is allowed to use the space again.
Leak testing outside the enclosure while licensed removal is in progress, so any failure of the enclosure is caught while the work is still going on.
Background and reassurance testing before a tenant, a contractor or a department takes an area back, so the handover rests on a figure rather than a look.
Testing carried out while the building stays in use, with the pumps sited where they measure what people are actually breathing rather than where it is convenient.
Where staff, tenants or parents need telling that an area is safe, a reassurance result is what answers it rather than an assurance on its own.
Which of the four tests applies depends on what the work is and when the area needs to be back in use.
Results
A result is a figure, a method and a standard. Three things come back.
Fibres per cubic centimetre, with the method, the duration and the standard it was measured against, so the number can be checked.
Where clearance passes, the certificate of reoccupation — the document that allows the area to be handed back, and the one people ask for later.
The area stays closed, the cause is found, remedial cleaning is done and the stage is repeated. Nothing is signed off on a retest alone.
The Legal Duty
The Control of Asbestos Regulations 2012 set a workplace control limit of 0.1 fibres per cubic centimetre averaged over four hours. That is a limit that must not be exceeded, not a safe level: the duty is to reduce exposure as low as reasonably practicable regardless. Where licensed removal has taken place, an area may only be reoccupied once it has been cleared to below 0.01 fibres per cubic centimetre as part of four-stage clearance.
HSE guidance HSG248, the analysts guide, sets out how samples are taken, how filters are prepared and counted, and how results are reported, and Approved Code of Practice L143 sits behind the regulations. Clearance after licensed work is carried out by an analyst independent of the removal contractor; where Ora has arranged licensed removal through a licensed contractor, the clearance is independent of that contractor. Our asbestos removal page explains how the two fit together.
Areas We Cover
Based in Great Wakering near Southend-on-Sea, we cover Essex, London and the wider South East.
We arrange air monitoring for schools, offices, industrial units, residential blocks and historic buildings across Southend-on-Sea, Rochford, Rayleigh, Basildon, Chelmsford, Brentwood, Colchester and into East London, usually alongside a survey or a removal we are already managing. Our accreditations page covers the documentation, and about Ora explains who does the work.
Get in Touch
Tell us what the work is, whether an enclosure is involved, and when the area needs to be back in use. We will confirm which of the four tests applies, what it costs and when it can be done. If material has just been disturbed and people are in the building, call 01702 690 693 rather than waiting for a reply. The contact page and our FAQ cover everything else.
Ora Asbestos Management Ltd
Unit 6, Crouchmans Yard, Poynters Lane,
Great Wakering, Essex, SS3 9TS
Hours: Monday–Saturday, 6am–6pm · Closed Sunday
That all four stages passed: the paperwork review, the visual inspection, an air test below 0.01 fibres per cubic centimetre and the final assessment after the enclosure came down. It certifies the area at that moment, not the building for all time.
No. It is the workplace control limit — a figure that must not be exceeded. The duty under CAR 2012 is to reduce exposure as low as reasonably practicable regardless of where a reading sits beneath it.
No. Air testing counts fibres in the air; it does not identify what a material is made of. That is bulk analysis, and the two answer different questions.
An analyst independent of the removal contractor. Where we have arranged licensed removal through a licensed contractor, the clearance is independent of that contractor — that independence is what makes the certificate worth anything.
The air test runs for a set period and the visual stages take as long as the enclosure needs. We give you the timings with the quote; what we will not do is promise a figure that depends on how clean the site is left.
The area stays closed. The cause is identified, remedial cleaning is carried out, and the failed stage is repeated. A fail is not a disaster, it is the system working — and it is why nobody should book the reoccupation before the certificate exists.
Not as a clearance requirement, but reassurance testing is often sensible afterwards, particularly in occupied buildings or where staff or tenants need to be told the area is back to normal.
Yes, and that is common. Background and reassurance testing are routinely carried out in occupied buildings, with the pumps sited where they measure what people are actually breathing.