ASBESTOS COMPLIANCE GUIDES · WRITTEN FOR DUTY HOLDERS
If you are responsible for maintaining a non-domestic building built or refurbished before 2000, Regulation 4 of the Control of Asbestos Regulations 2012 requires you to find out whether asbestos is present, record it, assess the risk, write and act on a management plan, review it, and give the information to anyone liable to disturb the material. These guides take that duty apart one obligation at a time, and set out what each one actually looks like in a building. They are written against CAR 2012, its Approved Code of Practice L143, and HSE guidance HSG264 and HSG248.
Every guide is written against the regulation itself and the HSE document that governs it, and names both, so you can check what we have told you.
No mortality figures, no photographs of ruined buildings. Duty holders make better decisions with the facts than they do frightened into them.
Guidance changes and these pages carry the date they were last checked. Where something is convention rather than law, we say which.
Gordon Ringland, BOHS P402, with over fifteen years in asbestos. The guides describe real buildings he has personally been inside and surveyed.
The Duty in Order
Regulation 4 itself: who holds the duty, which buildings it covers and the six things it asks. The commonest mistake is assuming a tenant or agent holds it by default.
A management survey to HSG264, or presuming asbestos is present until shown otherwise. The usual failure is a survey so old it no longer describes the building.
A register of every known or presumed material: where it is, what it is and its condition. Most often it exists but is never shown to the contractor about to drill into it.
Scoring each material for what it would do if disturbed and how likely disturbance is. The trap is treating the survey’s material score as the whole assessment.
Who does what about each item, by when, and how the information reaches anyone working on the fabric. The weak point is a plan written once and never acted on.
Re-inspection of every item at a set interval, with the plan reviewed alongside it each time. Cycles tend to lapse the year the person who started them moves on.
Those six are the duty. Everything below is what happens when the answer is that something has to move.
When It Moves
Four more guides, for the point at which managing it in place stops being the answer.
Management survey or refurbishment and demolition survey. The difference is intrusiveness and timing, and choosing wrong is the most expensive mistake on this list.
What HSG264 actually requires of a surveyor, what a survey report has to contain, and what a management survey deliberately does not cover at all.
What has to happen after licensed removal before anyone goes back in, who may carry it out, and what the <0.01 f/cm³ clearance certificate actually certifies.
Why asbestos waste is hazardous waste, what a consignment note is for, how long the records have to be kept and where the material is allowed to go.
Get in Touch
If a guide has not answered your question, ask it. We would rather tell you that you do not need a survey than sell you one, and a five-minute conversation usually settles whether what you are looking at is a problem. Describe the building, what you have found, and what you are planning to do to it.
Ora Asbestos Management Ltd
Unit 6, Crouchmans Yard, Poynters Lane,
Great Wakering, Essex, SS3 9TS
Hours: Monday–Saturday, 6am–6pm · Closed Sunday
Cookies on this site
We use strictly necessary cookies to make this site work. With your permission we would also like to use analytics cookies to see how the site is used so we can improve it. You can change your choice at any time. See our cookie policy.