ASBESTOS REGISTER · WHAT IT MUST CONTAIN
An asbestos register is the record of every asbestos-containing material known or presumed to be in a building: what it is, where it is, how much there is, what condition it is in, and how it scores for risk. It is produced by a management survey and it is the document the duty to manage under Regulation 4 of the Control of Asbestos Regulations 2012 is built on. A register is only useful if it is current and if the people who could disturb the material are actually shown it.
Every item is marked on a floor plan as well as described, because a written location nobody can find is not really a location at all.
Each item carries a material assessment and a priority assessment: what it would do if disturbed, and how likely disturbance actually is.
Every item is photographed in situ, so whoever reads the register later can recognise the material without being an asbestos surveyor.
Written so a contractor, a caretaker or an agent can read the relevant page in two minutes, not so that it looks thorough on a shelf.
Contents
For every item: what the material is, whether it was sampled or is presumed, its exact location described and plan-marked, the extent, the surface treatment, the condition, the accessibility, and the two risk scores. Alongside that, the survey it came from, the date, the surveyor, the laboratory certificates for anything sampled, photographs, and a clear statement of what was not accessed — the caveats. A register that does not say what it could not see is giving false comfort.
What it is not is a list of asbestos. It is a list of every material that could contain asbestos, including the ones confirmed clear and the ones presumed positive, because a reader needs to know that a material was considered. The commonest weakness we see in inherited registers is a tidy list of positives with nothing about everything else in the building — which leaves the next person unable to tell the difference between “not present” and “not looked at”.
Scoring
Two separate assessments, often confused, which answer different questions.
How readily the material would release fibres if disturbed: product type, condition, surface treatment and asbestos type, scored to HSG264.
How likely disturbance is where it actually sits: normal use, occupant activity, likelihood of maintenance, and the number of people exposed.
Material plus priority gives the order of work: a low-risk material in a high-traffic corridor can outrank a high-risk one in a locked plant room.
The surveyor scores the material assessment. The priority assessment needs the duty holder’s knowledge of how the building is actually used.
Keeping It Current
Condition changes. A board that was sound when the survey was done gets knocked by a trolley; a lagged pipe gets damaged by a leak; a ceiling tile gets lifted and not replaced properly. That is why re-inspection exists, normally annually, and why the register is a live document rather than a report. Re-inspection updates condition and scores; it does not repeat the survey.
The other half of keeping it current is recording what has happened to the building. Material removed comes off the register with the clearance certificate and consignment note attached. Material encapsulated is recorded as encapsulated with the date. New areas surveyed are added. Where a register has been inherited with a building, the first job is usually working out which of these has happened and which has not — see re-inspection surveys.
In Use
Caretakers and in-house maintenance teams, before drilling, lifting a ceiling tile or running a cable above it. If nobody checks, the first anyone knows is the dust.
The designer and the principal contractor, at the planning stage. The register shows what is known; an intrusive survey covers what the management survey could not reach.
The person on site that morning needs the two items in the room they are working in, rather than a ninety-page PDF. Being shown it should be recorded at the time.
Solicitors and surveyors, at dilapidations, assignment or sale. A current register shortens the enquiry; a missing one becomes a retention held against the price.
Clients and accreditation bodies, checking the duty holder has a record and uses it. Inconsistent registers across an estate are the finding that comes up most.
Everyone, immediately. The register tells you whether the material broken was asbestos, which decides whether the next step is a dustpan or a controlled clean-up.
In every one of those moments the register has to be findable in minutes by somebody who is not an asbestos specialist. That is the real test of whether it works.
Formats
The regulations do not prescribe one. What they require is that the information is held, kept current and can be handed to the people who need it.
Most registers start as the register section of a survey report: a table, the plans and the photographs, issued as a single PDF.
For a building in active use, a spreadsheet or a system that can be updated between surveys without reissuing the whole report.
Across multiple sites, the same structure and scoring everywhere — otherwise the estate cannot be compared or prioritised at all.
The Legal Position
Regulation 4 of the Control of Asbestos Regulations 2012 requires the duty holder to record the location and condition of asbestos-containing materials, or materials presumed to contain asbestos, and to keep that record up to date. It does not prescribe a format: a register can be a table in a report, a spreadsheet or an entry in a facilities system, provided it holds the information and can be given to the people who need it.
Approved Code of Practice L143 and HSE guidance HSG264 set out what a survey records and how the material assessment is scored. The priority assessment depends on how the building is used, so it needs the duty holder’s input rather than the surveyor’s alone; HSE’s own guidance sets out the algorithm for it in HSG227, A comprehensive guide to managing asbestos in premises, and says plainly that a priority assessment supplied in a survey report still has to be validated by the duty holder. The duty itself is covered on our duty to manage asbestos page.
Written by Gordon Ringland, Founder and Director, BOHS P402.
Areas We Cover
Based in Great Wakering near Southend-on-Sea, we cover Essex, London and the wider South East.
We produce and maintain registers for buildings and portfolios across Southend-on-Sea, Rochford, Rayleigh, Basildon, Chelmsford, Brentwood, Colchester and into East London. Where you have inherited a register with a building and have no idea whether it is current, that is a conversation worth having before somebody relies on it.
Get in Touch
Tell us whether you hold a register already, how old it is, and how many buildings are involved. If you have one, send it — we will tell you honestly whether it needs replacing or simply updating. If a contractor is on site now and nobody can find the register, call 01702 690 693. The contact page and our FAQ cover everything else.
Ora Asbestos Management Ltd
Unit 6, Crouchmans Yard, Poynters Lane,
Great Wakering, Essex, SS3 9TS
Hours: Monday–Saturday, 6am–6pm · Closed Sunday
Regulation 4 requires the duty holder to record the location and condition of asbestos-containing or presumed materials and keep the record current. The word “register” is not in the regulation, but the record it describes is what everybody calls a register.
Any format that holds the information and can be given to people who need it. A table in a survey report, a spreadsheet or a facilities system are all acceptable. What matters is that it is current and that somebody can find the relevant page quickly.
In practice it comes from a management survey carried out by a competent surveyor — BOHS P402 or equivalent. The duty holder can maintain it afterwards, but the survey behind it needs competence to stand up.
Whenever something changes, and at a review interval of normally twelve months through re-inspection. Removal, encapsulation and damage all need recording at the time, not at the next annual visit.
It depends on its age, whether the building has changed and whether anything has been removed since. Send it over — a register that is basically sound can often be brought up to date with a re-inspection rather than replaced.
The register says what is there. The plan says what you are doing about it, by when and who is responsible. The duty needs both, and holding only the first is the commonest form of non-compliance.
The relevant part does, before they start work, and the fact that they were shown it should be recorded. Handing over a ninety-page PDF and hoping is not the same as showing somebody the two items in the room they are working in.
The common parts do — hallways, risers, plant rooms, roof spaces and external areas. The individual flats do not, unless the lease puts their maintenance in someone else’s hands.