ASBESTOS FOR LANDLORDS AND MANAGING AGENTS · ESSEX AND LONDON
If you let or manage property built before 2000, somebody holds the duty to manage asbestos under Regulation 4 of the Control of Asbestos Regulations 2012, and the lease usually decides who. In a block of flats the individual homes are outside the duty but the common parts are not: hallways, stairwells, risers, plant rooms, roof spaces and external areas are non-domestic premises and need a register, a risk assessment and a management plan like any office. We survey, score, record and maintain them across Essex, London and the wider South East.
The flats are outside the duty. The hallways, risers, plant rooms and roof spaces are not, and that catches more agents out than anything.
A full repairing lease usually leaves the structure, plant and common parts with the landlord. Where it is silent, the duty follows practical control.
Across a portfolio the same structure and scoring on every block, so the estate can be prioritised instead of read one PDF at a time.
What you hold has to satisfy somebody else’s audit as well as your own. We write it to be handed over, not merely to exist in a drawer.
Who Holds It
Regulation 4 puts the duty on whoever has an obligation for the maintenance or repair of the premises by virtue of a contract or tenancy — and where no contract says, on whoever has control. For a let building that means reading the lease before anything else. A full repairing and insuring lease normally puts the demise on the tenant while the landlord keeps the structure, the plant and the common parts. A multi-let office is often split three ways: the agent holds the common parts, each tenant holds their own floor, and nobody has written down which items on the register belong to whom.
That last point is where the arguments start, and it is cheap to prevent. When we survey a let building we mark each item on the register with the party responsible for it, taken from the lease rather than assumed. It takes an extra hour at survey stage and it settles the question that would otherwise surface at a dilapidations claim three years later, when nobody can remember.
The Essentials
Four things. Most blocks we are called to have the first and none of the others.
Of the common parts: hallways, stairs, risers, plant rooms, roof voids, bin stores and external areas. Not the flats, unless the lease puts them in your hands.
Plan-marked, photographed and scored, with the responsible party against each item so a tenant query has an answer rather than a search.
What happens to each item, by when and whose job it is. The document that turns a survey into compliance and the one most often found missing.
Normally annual, booked across the portfolio in one window so the registers come back together rather than drifting apart block by block.
At Scale
The problem at portfolio scale is almost never a single building. It is that block twelve was surveyed by one firm in 2019, block thirty-one by another in 2023, and the two registers score differently, look different and cannot be read against each other. Nobody can say which block to spend money on first, because the information does not compare. That is a procurement problem dressed up as a compliance problem, and it gets worse every year it is left.
The fix is dull and effective: one format, one scoring approach, one review window, and a reconciliation pass over what already exists rather than surveying everything again from scratch. Plenty of inherited registers are sound enough to build on — the work is checking which, bringing the rest up, and then never letting them diverge again. We will say which registers stand up before quoting to replace them, which occasionally costs us a survey and is still the right answer.
Typical Situations
Inherited paperwork of unknown quality and a handover deadline. The first job is reading what exists before deciding what needs doing.
Somebody above you wants evidence rather than assurances. They pick one block at random, which is the whole test of how a portfolio is run.
Rewiring, a door scheme, a roof repair. The management survey does not cover a strip-out, so an intrusive survey of the area comes first.
Somebody has asked directly whether there is asbestos in the building. A current register answers it factually and that is usually the end of it.
Dilapidations, assignment or sale. A current register shortens the enquiry; a missing one turns into a retention held against the sale price.
A contractor has gone through something in a riser or a ceiling. Work stops, the area is closed, and the register tells us what we are dealing with.
Five of those six arrive with a deadline attached. The sixth arrives without one, and it is the one that decides how the other five go.
Where It Goes Wrong
Three failures, and we see all three regularly enough that they are worth naming rather than hinting at.
The duty sits on the common parts and the survey covered the flats instead. Rarer than the reverse, and expensive when it does happen.
Cleaners above ceilings, aerial fitters in roof voids, plumbers in risers. The duty is discharged when somebody is shown it, not when it exists.
Different firms, different formats and different years. The honest answer to an audit becomes “it depends which block you are asking about”.
The Legal Position
Regulation 4 of the Control of Asbestos Regulations 2012 applies to all non-domestic premises and to the common parts of domestic premises. That second limb is the one that matters here: a block of flats is housing, but its hallways, stairwells, risers, plant rooms, roof spaces and external areas are within the duty, which is why managing agents and residents’ management companies hold it even though nobody lives in a riser. The individual flats sit outside it, unless a lease puts their maintenance in someone else’s hands.
Where the duty sits between landlord, agent and tenant is decided by the maintenance obligation in the contract or tenancy, and where responsibility is genuinely shared, each party holds their share — it does not default to the largest or the most solvent. Approved Code of Practice L143 explains how the duty is met and carries special legal status: following it is not compulsory, but a failure to follow it is treated as evidence of a breach unless compliance is shown another way. The duty in full is set out on our duty to manage asbestos page.
Written by Gordon Ringland, Founder and Director, BOHS P402.
Areas We Cover
Based in Great Wakering near Southend-on-Sea, we cover Essex, London and the wider South East.
In Essex, the stock that keeps us busy is specific. Southend’s conversion belt through Westcliff and the centre is thousands of large Victorian and Edwardian terraces split into flats and HMOs, mostly in the 1960s and 70s — and when they were split, asbestos insulating board was used to form fire-breaks between floors and on the backs of fire doors. That is a common-parts item, it is in a fire-protection role, and it is the single most reliable finding on a converted Southend block. On the seafront, salt air degrades external asbestos cement soffits and roof sheets faster than the same material would decay inland, which is a condition-monitoring argument rather than a removal one.
The New Town estates are a different problem. Basildon was built out between roughly 1950 and 1980 — the peak decades — so in estates like Fryerns, Lee Chapel, Barstable and Vange asbestos is systemic rather than sporadic: AIB in warm-air heating cupboards, soffits and partition walls, across thousands of ex-council homes now in private and mixed ownership. Harlow’s original neighbourhoods, Mark Hall and Netteswell among them, carry the same warm-air cupboard pattern. Basildon’s 1960s system-built town centre around Eastgate is the higher-risk end, where sprayed coatings on concrete beams and heavy AIB in service risers turn up in civic and commercial blocks. Colchester adds converted garrison accommodation around Circular Road and Victorian town-centre blocks on the High Street and North Hill.
Into London the question changes shape but not substance. Mansion-block communal risers — NW3, Marylebone, Maida Vale — are frequently lined with AIB, and because those risers run vertically through private flats, the first thing a managing agent is asked is whether the board in the wall belongs to the leaseholder or the freeholder. In the east, the 1950s and 60s social housing across Poplar, Bow and Bethnal Green used AIB extensively in risers, communal lobbies and heater cupboards; the brutalist concrete estates carry ACMs in plant rooms and service ducts instead. In every one of those cases the material is in the common parts, which means it is squarely within the duty.
Get in Touch
Tell us how many blocks or buildings are involved, roughly when they were built, and what you hold already — including anything inherited that you have not read yet. We will tell you what is missing, what can be built on and what it costs to get the portfolio onto one standard. If something has been disturbed today, call 01702 690 693. The contact page and our FAQ cover everything else.
Ora Asbestos Management Ltd
Unit 6, Crouchmans Yard, Poynters Lane,
Great Wakering, Essex, SS3 9TS
Hours: Monday–Saturday, 6am–6pm · Closed Sunday
Usually not. The duty covers non-domestic premises and the common parts of residential blocks, so hallways, risers, plant rooms and roof spaces are in and the individual flats are out — unless a lease puts their maintenance in someone else’s hands.
Whoever has the maintenance obligation, which the management agreement and the lease decide between them. In practice an agent appointed to maintain the common parts is holding it for those areas, and it is worth having that written down rather than assumed.
A management survey of the common parts, then a register and a plan. If paperwork exists but nobody knows its quality, send it first — a sound register is cheaper to update than to replace, and we will tell you which it is.
Show them the relevant part of the register. A current register answers the question factually, and that is usually the end of it. An evasive answer is what turns a query into a complaint.
They need the relevant part of it before they start, and you need a record that you gave it to them. Fit-outs and tenant alterations are a common route to disturbing something nobody checked.
Yes, and one format across all of it is the point. We book the estate into a single window and return the registers together, so the portfolio can be read as a portfolio.
Asbestos was banned in 1999, so post-2000 construction is very unlikely to contain it. The duty still technically applies, and the usual answer is a short record stating the construction date and the basis for concluding there is none.
That is a lease question rather than an asbestos question, and it varies. Most service charge provisions cover the common parts, which is where this work sits, but we would not advise on your specific lease and you should not take our word for it.