HSG264 · HSE’S ASBESTOS SURVEY GUIDE · WHAT IT REQUIRES

HSG264 Explained

What HSE's survey guide actually asks of a surveyor, a survey and a report.

HSG264, Asbestos: The Survey Guide, is HSE’s main guidance on how asbestos surveys are planned, carried out and reported. It sets out two survey purposes — management, and refurbishment and demolition — replacing the old Type 1, 2 and 3 labels. It describes what a competent surveyor should do on site, how materials should be sampled or reasonably presumed, how findings should be assessed for risk, and what the report must contain. It is guidance rather than law, but it is how the survey duties in the Control of Asbestos Regulations 2012 are met in practice, and a survey that departs from it needs a reason.

Guidance, Not Law

HSG264 is not a statutory instrument. It is how the survey duties in CAR 2012 are met in practice, and departing from it needs a stated reason.

Two Types, Not Three

HSG264 replaced the old Type 1, 2 and 3 labels. A report still using them is working from superseded terminology, which is worth noticing.

Scope Must Be Specific

HSG264 discourages generic caveats. The scope and limitations should name this building and this survey, not be boilerplate from a template.

Presumption Is Proper

Where sampling is unsafe or impossible, a reasoned presumption is a proper outcome. It belongs in the register as clearly as a lab result.

The Document

What HSG264 Is and What It Governs

HSG264 is HSE’s guidance on asbestos surveying, now in its second edition. It covers surveyor competence and quality assurance, how a survey should be planned, how it should be carried out on site, what the report should contain, and how a duty holder should use the information afterwards. It is written for both ends of the transaction — the surveyor doing the work and the client commissioning it — which is why it is a genuinely useful document for a duty holder to have read, rather than a technical manual to be left to a contractor.

Its most important structural contribution is the one most often missed: it defines surveys by purpose rather than by depth. The old Type 1, 2 and 3 labels described how intrusive a survey was. HSG264’s two types describe what the survey is for — managing a building in use, or clearing an area before work. A report that still uses Type 1/2/3 language is not necessarily a bad report, but it is working from terminology HSE replaced, and that is worth asking about.

An asbestos survey report open on a desk at a floor plan with coloured location markers, beside a photograph page and a highlighter

The Report

What Should Be in the Document You Get Back

Four things worth checking before you accept a report as complete.

A gloved hand holding a sample tin against a board beside a sealed sample point and a numbered label

On Site

Planning, Inspection and Sampling

HSG264 treats planning as part of the survey rather than as admin before it. That means agreeing the scope and purpose, reviewing whatever already exists — previous surveys, the current register, operation and maintenance manuals — identifying access constraints and hazards such as confined spaces and live services, agreeing a sampling strategy, and producing a method statement. A surveyor who arrives having asked for none of that is starting from less information than they could have had.

On site the method is systematic visual inspection, representative bulk sampling of suspect materials, photographic records, marking or identification where appropriate, and — importantly — recording the areas that could not be accessed. Where sampling is unsafe or physically impossible, a reasoned presumption is recorded instead, and that is a proper outcome rather than a gap. Bulk samples are analysed against HSG248, the analysts’ guide, by a laboratory accredited to ISO/IEC 17025. Ours go to an independent UKAS-accredited laboratory — see sampling and testing.

Assessment

The Inputs Behind the Scores

The material assessment is about the stuff. The priority assessment is about the building, and only the duty holder can validate it.

Before You Commission

Three Questions Before You Book

The Legal Position

Where HSG264 Sits in the Law

HSG264 is guidance. It is not a statutory instrument and it does not create duties of its own. The duties sit in the Control of Asbestos Regulations 2012 — Regulation 4, which requires the duty holder in non-domestic premises to find out whether asbestos is present and in what condition, record it, assess the risk, plan, act, review and inform; and Regulation 5, which requires asbestos to be identified before work liable to expose anyone to it. HSG264 is HSE’s account of how the survey element of both is properly done.

Approved Code of Practice L143 occupies different ground again and carries special legal status: following it is not compulsory, but a failure to follow it is treated as evidence of a breach unless compliance is shown another way. HSG264 does not carry that status — it is ordinary guidance. In practice the distinction rarely matters to a duty holder, because a survey that departs from HSG264 without a stated reason is hard to defend as suitable and sufficient. On competence, HSE strongly recommends using surveyors accredited to BS EN ISO/IEC 17020 as inspection bodies, delivered through UKAS, and UKAS sets the sector-specific expectations in RG 8. That is a recommendation and not a legal requirement. What matters in practice is that the survey is carried out to that standard by a properly qualified surveyor, which is how we work. For refurbishment and demolition work, survey findings also feed the pre-construction information under CDM 2015 — see refurbishment and demolition surveys.

Author: Gordon Ringland, Founder and Director, BOHS P402. Reviewed 13 November 2026.

Areas We Cover

Surveys to HSG264 Across Essex, London and the South East

Based in Great Wakering near Southend-on-Sea, we cover Essex, London and the wider South East.

A good share of the HSG264 work we do locally starts with a document rather than a building: a register that arrived with a property purchase, a survey commissioned by a previous managing agent, or a report on pre-2000 commercial stock still written to the old Type 1, 2 and 3 terminology. We read those against the guide first, and only recommend new survey work where the existing record cannot be built on.

Get in Touch

Ask About a Survey Report

If you are holding a survey and are not sure whether it covers what you need it to, send it. We will tell you what it covers, what it does not, and whether it is worth building on — and if the honest answer is that it is sound and you need nothing, we will tell you that. If you are about to commission one, describe the building and we will tell you which type applies.

Drag & Drop Files, Choose Files to Upload You can upload up to 3 files.
Optional. PDF, Word, JPG or PNG, up to 3 files, 20MB each.
Anything that helps us quote: the age and size of the building, planned works and dates, any existing asbestos survey or register, or what you think you have found. If asbestos may have just been disturbed, please call 01702 690 693 rather than waiting for a reply.

Ora Asbestos Management Ltd
Unit 6, Crouchmans Yard, Poynters Lane,
Great Wakering, Essex, SS3 9TS
Hours: Monday–Saturday, 6am–6pm · Closed Sunday

HSG264: Common Questions

A:

No. It is HSE guidance on how asbestos surveys should be done. The duties are in the Control of Asbestos Regulations 2012, principally Regulations 4 and 5. HSG264 is how the survey element of those duties is met in practice, and departing from it needs a reason.

A:

HSG264 replaced them with two types defined by purpose: a management survey and a refurbishment and demolition survey. The old labels described intrusiveness; the new ones describe what the survey is for. A report still using Type 1/2/3 is working from superseded terminology.

A:

No. HSE strongly recommends surveys carried out to ISO/IEC 17020, but the legal test is competence. What matters is the standard a survey is delivered to and the qualifications of the person doing it. Ours are carried out to that standard by Gordon Ringland, who holds BOHS P402.

A:

A material recorded as asbestos-containing because it could not be safely or practicably sampled, and nothing shows otherwise. HSG264 treats it as a proper survey outcome. It should appear in the register as clearly as a sampled result, and it can be resolved later if the material is to be disturbed.

A:

Because HSG264 requires it, and because it is the most useful section in the document. No-access areas and limitations tell you exactly where the survey stops, which is what a contractor needs to know before starting work in one of them.

A:

The material assessment rates what a material would do if disturbed — its type, condition, surface treatment and asbestos type. The priority assessment rates how likely disturbance is where it sits, which depends on how the building is used. The surveyor scores the first; the duty holder has to validate the second.

A:

You can, and the thing to compare is scope rather than price. Two quotes for a management survey can differ by how much is sampled, how much is presumed and how many areas are excluded. Ask both for the sampling strategy and the expected limitations before comparing the figures.

A:

HSG264 sets no expiry. The register has to reflect the building, which is why re-inspection is normally annual by convention rather than by law, and why a refurbishment changes the answer regardless of how recent the survey was. Re-inspection covers the cycle.