ASBESTOS RISK ASSESSMENT · MATERIAL AND PRIORITY

Asbestos Risk Assessment

Two scores, one order of work, and only one of them is the surveyor’s to make.

Asbestos risk assessment is how a list of materials becomes an order of work. Each item on the register carries two separate scores: a material assessment, which rates how readily the material would release fibres if it were disturbed, and a priority assessment, which rates how likely disturbance actually is where it sits. The material assessment comes from the survey. The priority assessment depends on how the building is used, so it needs the duty holder. Together they decide what gets dealt with first.

Two Different Questions

One score asks what the material would do if disturbed. The other asks how likely that is here. Neither answers for the other.

The Surveyor Scores One

The material assessment comes from the survey, scored to HSG264. It judges the material itself, and not the building it sits in.

You Score the Other

The priority assessment needs what only the duty holder knows: who goes where, how often, and what work happens in that space.

Scores Are Not Fixed

A score reflects condition and use on the day. Both change, which is why re-inspection updates them rather than repeating them.

Material Assessment

What the Material Assessment Measures

The material assessment rates how readily an item would release fibres if something disturbed it. It is built from what the material is, what condition it is in, whether its surface is sealed or bare, and which type of asbestos it contains. A sound, painted asbestos cement sheet and a damaged length of pipe lagging sit at opposite ends of that range, and the gap between them is the whole point of scoring rather than simply listing.

This score is the surveyor’s. It is made at the time of the survey, recorded against the item in the register, and it travels with the item until the condition changes. What it does not tell you is whether anybody is ever likely to touch the thing — a badly damaged board behind a sealed brick wall scores high on material and may still be the last item you deal with.

Damaged pipe lagging examined by torchlight, the wrap split along one section — the condition that drives the material assessment score

The Inputs

What Each Assessment Is Built From

Four groups of inputs, and the split between them is the split between the two assessments.

Product Type

What the material is. Loose fill and sprayed coatings behave very differently from reinforced cement, and the score reflects that before anything else.

Condition and Surface

Damage, deterioration and whether the surface is sealed, painted or bare. The input most likely to have changed since the last visit here.

Normal Occupant Use

Who is in that space, how many, and for how long. A plant room nobody enters and a primary school corridor are not the same exposure.

Maintenance Activity

How often work happens there and how intrusive it is. The input duty holders underestimate, because routine work is invisible until it goes wrong.

A surveyor and a duty holder working through the priority assessment over a floor plan, agreeing how each room is actually used

Priority Assessment

Why the Priority Assessment Has to Be Yours

The priority assessment rates the likelihood of disturbance where the material actually sits. That depends on things no surveyor can see in a day: which rooms get used and by whom, where the contractors go, which ceiling void carries the cabling everybody keeps pulling, how often the building is altered, and what time of year it empties out. A surveyor can offer a starting point from what they observed, but the knowledge that makes it accurate belongs to whoever runs the building.

HSE’s own guidance is explicit about this: where a priority assessment is supplied in a survey report, the duty holder still has to validate it, because only they know what happens in the building. In practice we score an initial priority assessment, then sit down with the duty holder and change it — and the conversation almost always moves at least one item, usually upwards. See our duty to manage asbestos page for where that obligation comes from.

In Use

What the Scores Actually Decide

The Order of Work

Which item gets dealt with first, and which one waits. Without scores the order defaults to whatever somebody happened to notice most recently.

The Budget Case

A scored estate is an arguable estate. It is far easier to defend spending when the ranking came from a published method rather than an opinion.

Remove or Manage

High material and low priority usually means manage it in place. High on both is the combination that moves an item up the list quickly.

Re-inspection Intervals

Higher-scoring items can justify being looked at more often than the standard twelve months. The interval is a decision, not a fixed rule.

Where to Start

Across a portfolio, consistent scoring is what lets one site be compared with another. Without it an estate cannot be prioritised at all.

What Contractors Hear

The items somebody needs warning about first are the ones scoring high on both. That is what the register extract should lead with, every time.

None of those decisions is made by the score on its own. What the scores do is make the reasoning visible, which is what an inspector or an auditor is actually asking to see.

Change

What Moves a Score

Three things, and only the first of them involves anybody touching the material.

Condition Deteriorates

Damage, water ingress or wear moves the material assessment. This is what re-inspection exists to catch, and why the interval matters.

The Use Changes

A new tenant, a change of use or a refurbishment moves the priority assessment upwards without the material itself changing at all.

It Is Dealt With

Encapsulation lowers the material score and keeps the item on the register. Removal takes it off entirely, with the paperwork attached to it.

The Legal Position

Where Risk Assessment Sits in CAR 2012

Regulation 4 of the Control of Asbestos Regulations 2012 requires the duty holder to assess the risk from asbestos-containing materials, or materials presumed to contain asbestos, once their location and condition have been recorded. The regulation does not name a scoring system or set a numerical threshold. What it requires is that the risk is assessed and that the plan which follows is built on that assessment rather than on guesswork.

HSE guidance HSG264 sets out the material assessment algorithm used by surveyors. The priority assessment algorithm is published in HSG227, A comprehensive guide to managing asbestos in premises, which also sets out worked examples; HSE’s own duty-to-manage guidance states that a priority assessment provided in a survey report still has to be validated by the duty holder. Approved Code of Practice L143 covers how the duty as a whole is met.

Written by Gordon Ringland, Founder and Director, BOHS P402.

Areas We Cover

Risk Assessment Across Essex, London and the South East

Based in Great Wakering near Southend-on-Sea, we cover Essex, London and the wider South East.

We score registers and work through priority assessments with duty holders across Southend-on-Sea, Rochford, Rayleigh, Basildon, Chelmsford, Brentwood, Colchester and into East London. Where a register has arrived with scores already on it and no record of who set them or when, that is worth an hour before it is relied on.

Get in Touch

Ask About Asbestos Risk Assessment

Tell us whether your register is already scored, how old the scores are, and how the building is used day to day. Send the register if you have it. We will tell you whether the scoring stands up and what it would take to bring the priority side up to date. If something has been damaged today, call 01702 690 693. The contact page and our FAQ cover everything else.

Drag & Drop Files, Choose Files to Upload You can upload up to 3 files.
Send it and we will tell you whether the scoring stands up. PDF, Word, Excel, JPG or PNG, up to 3 files, 20MB each.
How the building is used day to day: who is in which spaces, and what maintenance work happens where.

Ora Asbestos Management Ltd
Unit 6, Crouchmans Yard, Poynters Lane,
Great Wakering, Essex, SS3 9TS
Hours: Monday–Saturday, 6am–6pm · Closed Sunday

Asbestos Risk Assessment: Common Questions

A:

The material assessment rates what the material would do if disturbed. The priority assessment rates how likely disturbance is where it sits. A material can score high on one and low on the other, which is exactly why both exist.

A:

The duty holder, because it depends on how the building is used. A surveyor can supply a starting score from what they saw, but HSE guidance is clear that the duty holder still has to validate it.

A:

No. The regulations require the risk to be assessed and the management plan to follow from it. They do not set a numerical threshold, and anyone quoting one as a legal limit is confusing a scoring system with a regulation.

A:

No. A high score means it has to be dealt with sooner, and removal is one of four options alongside monitoring, labelling and encapsulation. Removal is often the most disruptive answer rather than the safest.

A:

It is an incomplete one. The record and the assessment are separate obligations under Regulation 4, so an unscored register leaves the second one unmet and gives the plan nothing to prioritise against.

A:

Material scores at re-inspection, normally annually, because condition changes. Priority scores whenever the use of a space changes — a new tenant or a refurbishment can move them without anybody touching the material.

A:

Usually they can be used as a starting point. What matters is whether they were scored to the published algorithms, when, and whether anybody has validated the priority side since. Send it over and we will tell you.

A:

Yes. Presumed material carries the same management obligations as confirmed material, so it is scored on the presumption. If that produces an uncomfortable result, that is usually the argument for sampling it.